COGS Calculator

Prototype System

Stainless Tank 5000L

Manage industrial workforce roles, man-hours, and specialized rates.

Total Items

8

Total Man-Hours

440 Hrs

Weekly Prime Cost

IDR 193,701,600

Budget Utilization

1937.0%

Material Configuration

Config Mode

Unit Weight

0.000 kg

Total Weight

0.000 kg

Estimated Subtotal

IDR 0

Project Itemization

Total Material Cost

3607.68 kg | IDR 163,401,600

Item DetailsDimensions (mm)QtyWeightSubtotal

PLATE SUS304 6mm

plate

2400L x 1200W x 6T202764.80 kgIDR 124,416,000

PLATE SUS304 8mm (Bottom)

plate

2400L x 1200W x 8T4737.28 kgIDR 33,177,600

PIPE SUS304 4 inch sch40

pipe

1000L x ø114.34105.60 kgIDR 5,808,000
Technical Preview
plate Rendering
L:2,400W:1,200T:6

Est. Weight

138.24 kg

Material

8.00 g/cm³