COGS Calculator

Prototype System

Modular Storage Rack System

Manage industrial workforce roles, man-hours, and specialized rates.

Total Items

8

Total Man-Hours

128 Hrs

Weekly Prime Cost

IDR 101,311,500

Budget Utilization

1013.1%

Material Configuration

Config Mode

Unit Weight

0.000 kg

Total Weight

0.000 kg

Estimated Subtotal

IDR 0

Project Itemization

Total Material Cost

6658.62 kg | IDR 93,751,500

Item DetailsDimensions (mm)QtyWeightSubtotal

ANGLE 60x60x6 (Upright)

angle

2400L202112.00 kgIDR 26,400,000

UNP 80 Channel (Beam)

unp

2000L154207.50 kgIDR 63,112,500

PLATE SS400 3mm (Shelf)

plate

2000L x 600W x 3T12339.12 kgIDR 4,239,000
Technical Preview
angle Rendering
L:2,400H:60

Est. Weight

0.00 kg

Material

7.85 g/cm³