COGS Calculator

Prototype System

Conveyor Frame Assembly

Manage industrial workforce roles, man-hours, and specialized rates.

Total Items

8

Total Man-Hours

240 Hrs

Weekly Prime Cost

IDR 144,146,250

Budget Utilization

1441.5%

Material Configuration

Config Mode

Unit Weight

0.000 kg

Total Weight

0.000 kg

Estimated Subtotal

IDR 0

Project Itemization

Total Material Cost

9256.50 kg | IDR 132,206,250

Item DetailsDimensions (mm)QtyWeightSubtotal

UNP 100 Channel

unp

6000L106600.00 kgIDR 99,000,000

ROUND BAR SS400 30mm

round-bar

3000L x ø305832.50 kgIDR 10,406,250

ANGLE 50x50x5

angle

6000L81824.00 kgIDR 22,800,000
Technical Preview
unp Rendering
L:6,000H:100

Est. Weight

63.49 kg

Material