COGS Calculator

Prototype System

SUS316 Mixing Vessel

Manage industrial workforce roles, man-hours, and specialized rates.

Total Items

9

Total Man-Hours

880 Hrs

Weekly Prime Cost

IDR 305,920,800

Budget Utilization

3059.2%

Material Configuration

Config Mode

Unit Weight

0.000 kg

Total Weight

0.000 kg

Estimated Subtotal

IDR 0

Project Itemization

Total Material Cost

3806.72 kg | IDR 247,820,800

Item DetailsDimensions (mm)QtyWeightSubtotal

PLATE SUS316 6mm (Shell)

plate

2400L x 1200W x 6T182488.32 kgIDR 161,740,800

PLATE SUS316 10mm (Dish End)

plate

2000L x 2000W x 10T41280.00 kgIDR 83,200,000

PIPE SUS316 2 inch sch10

pipe

500L x ø60.3638.40 kgIDR 2,880,000
Technical Preview
plate Rendering
L:2,400W:1,200T:6

Est. Weight

138.24 kg

Material

8.00 g/cm³