COGS Calculator

Prototype System

Skid Frame Pump Package

Manage industrial workforce roles, man-hours, and specialized rates.

Total Items

9

Total Man-Hours

192 Hrs

Weekly Prime Cost

IDR 101,564,950

Budget Utilization

1015.6%

Material Configuration

Config Mode

Unit Weight

0.000 kg

Total Weight

0.000 kg

Estimated Subtotal

IDR 0

Project Itemization

Total Material Cost

6252.30 kg | IDR 90,244,950

Item DetailsDimensions (mm)QtyWeightSubtotal

H-BEAM 200x200x8x12

h-beam

4000L42198.40 kgIDR 39,571,200

PLATE SS400 12mm (Baseplate)

plate

2400L x 1200W x 12T3813.90 kgIDR 10,173,750

ANGLE 75x75x8

angle

6000L63240.00 kgIDR 40,500,000
Technical Preview
h beam Rendering
L:4,000H:200

Est. Weight

194.93 kg

Material

7.85 g/cm³