Maintenance Walkway & Handrail
Manage industrial workforce roles, man-hours, and specialized rates.
Total Items
7
Total Man-Hours
160 Hrs
Weekly Prime Cost
IDR 60,046,500
Budget Utilization
600.5%
Material Configuration
Config ModeUnit Weight
0.000 kg
Total Weight
0.000 kg
Estimated Subtotal
IDR 0
Project Itemization
Total Material Cost
4094.32 kg | IDR 51,179,000
| Item Details | Dimensions (mm) | Qty | Weight | Subtotal | |
|---|---|---|---|---|---|
PLATE SS400 6mm (Grating) plate | 2400L x 1200W x 6T | 8 | 1085.20 kg | IDR 13,565,000 | |
ROUND BAR SS400 25mm (Handrail) round-bar | 6000L x ø25 | 10 | 2898.00 kg | IDR 36,225,000 | |
PIPE SS400 2 inch sch40 (Post) pipe | 1100L x ø60.3 | 12 | 111.12 kg | IDR 1,389,000 |
Technical Preview
plate Rendering
L:2,400W:1,200T:6
Est. Weight
135.65 kg
Material
7.85 g/cm³