COGS Calculator

Prototype System

Maintenance Walkway & Handrail

Manage industrial workforce roles, man-hours, and specialized rates.

Total Items

7

Total Man-Hours

160 Hrs

Weekly Prime Cost

IDR 60,046,500

Budget Utilization

600.5%

Material Configuration

Config Mode

Unit Weight

0.000 kg

Total Weight

0.000 kg

Estimated Subtotal

IDR 0

Project Itemization

Total Material Cost

4094.32 kg | IDR 51,179,000

Item DetailsDimensions (mm)QtyWeightSubtotal

PLATE SS400 6mm (Grating)

plate

2400L x 1200W x 6T81085.20 kgIDR 13,565,000

ROUND BAR SS400 25mm (Handrail)

round-bar

6000L x ø25102898.00 kgIDR 36,225,000

PIPE SS400 2 inch sch40 (Post)

pipe

1100L x ø60.312111.12 kgIDR 1,389,000
Technical Preview
plate Rendering
L:2,400W:1,200T:6

Est. Weight

135.65 kg

Material

7.85 g/cm³