COGS Calculator

Prototype System

Steel Platform Structure

Manage industrial workforce roles, man-hours, and specialized rates.

Total Items

7

Total Man-Hours

400 Hrs

Weekly Prime Cost

IDR 117,251,800

Budget Utilization

1172.5%

Material Configuration

Config Mode

Unit Weight

0.000 kg

Total Weight

0.000 kg

Estimated Subtotal

IDR 0

Project Itemization

Total Material Cost

6854.40 kg | IDR 95,401,800

Item DetailsDimensions (mm)QtyWeightSubtotal

PLATE SS400 10mm

plate

2400L x 1200W x 10T155086.80 kgIDR 63,585,000

H-BEAM 150x150x7x10

h-beam

6000L61767.60 kgIDR 31,816,800
Technical Preview
plate Rendering
L:2,400W:1,200T:10

Est. Weight

226.08 kg

Material

7.85 g/cm³